Installation qualification for HPLC
Installation qualification establishes that the instrument is received as designed and
specified, that it is properly installed in the selected environment, and that this environment is suitable for the operation and use of the instrument.
Before installation :
• Obtain manufacturer’s recommendations for installation site requirements.
• Check the site for the fulfillment of the manufacturer’s recommendations (utilities
such as electricity, and environmental conditions such as humidity and
temperature).
• Allow sufficient shelf space for the equipment, SOPs, operating manuals and
software.
During installation :
• Compare equipment, as received, with purchase order (including software,
accessories, spare parts)
• Check documentation for completeness (operating manuals, maintenance
instructions, standard operating procedures for testing, safety and validation
certificates)
• Check equipment for any damage
• Install hardware (computer, equipment, fittings and tubings for fluid connections,
columns in HPLC and GC, power cables, data flow and instrument control cables)
• Switch on the instruments and ensure that all modules power up and perform an
electronic self-test
• Identify and make a list with a description of all hardware, include drawings where
appropriate.
• Run test sample and compare chromatogram print-out with reference
chromatogram
• List equipment manuals and SOPs
• Prepare an installation report
Comments
Post a Comment